Taping and Level 5 finishing

We provide detailed drywall finishing for standard and custom projects: taping, mudding and smooth finishes up to Level 5, with a focus on clean lines and consistency.

  • CSLB #1000495B – General Building
  • Licensed and bondedWorkers’ comp insured
  • Four countiesOrange, Los Angeles, Riverside, San Bernardino
  • Family-ownedSince 2015

Finished to the light it will live in.

The industry grades drywall finish from Level 0 to Level 5 (Gypsum Association, GA-214). Level 4 is the usual finish under flat paint. Level 5 adds a thin skim coat over the entire surface, and it is the finish meant for gloss and semi-gloss paints and for hard light, such as wall washers or sun from a nearby window.

High-end custom homes are full of that kind of light: tall windows, long walls, recessed fixtures. That is where a Level 5 finish shows its worth, and where we spend our care.

What this includes

  • Paper tape bedded in compound
  • Corner bead on outside corners
  • Coats feathered wide and sanded
  • Level 4 finish for flat paint
  • Level 5 skim coat over the whole surface
  • Walls and ceilings ready for paint
Plan this work

How the work goes

From the first look to the last coat.

  1. Tape the joints

    Paper tape bedded in joint compound at every joint and inside corner; corner bead set on the outside corners.

  2. Coat and feather

    Coats over the joints, corners and fasteners, each one feathered wider than the last so the joint disappears into the board.

  3. Sand and check

    Each coat sanded and checked with a light held low across the wall, the way the room’s own light will show it.

  4. Skim for Level 5

    Where the paint or the light calls for it, a thin skim coat over the entire surface: Level 5 in GA-214.

What we provide

Everything the work covers.

  • Paper tape bedded in compound

    Tape set in joint compound at every joint and inside corner, so the seams are closed and strong.

  • Corner bead on outside corners

    Bead on every outside corner for a straight, protected edge.

  • Coats feathered and sanded

    Each coat spread wider than the last and sanded smooth, so joints and fasteners disappear into the board.

  • Level 4 for flat paint

    The usual smooth finish under flat paint: two coats over the joints, three over fasteners and bead (GA-214).

  • Level 5 skim coat

    A thin skim over the entire surface, for sheen paint, dark colours and hard, low light (GA-214).

  • Ready for paint

    Walls and ceilings handed over smooth and ready for the painter.

On site

The work, in real rooms.

Open landing above a double-height room, walls finished
Open landing above a double-height room, walls finished
Upstairs hall that looks down into the stairwell
Upstairs hall that looks down into the stairwell
Hall with a curved stair wall and a doorway, finished
Hall with a curved stair wall and a doorway, finished
Room with a wide arched opening, a row of small windows and a stair rail
Room with a wide arched opening, a row of small windows and a stair rail
Room with an arched niche beside an arched doorway
Room with an arched niche beside an arched doorway
Corridor under skylights, walls finished
Corridor under skylights, walls finished
Double-height room with a red steel stair and tall windows
Double-height room with a red steel stair and tall windows
Double-height living room with a fireplace wall and glass on both sides
Double-height living room with a fireplace wall and glass on both sides

Questions

Good to know.

Plain answers about taping and level 5 finishing. For anything else, call (323) 440-0395.

Level 5 is the highest level of drywall finish in the Gypsum Association's GA-214. It includes all the work of Level 4 plus a thin skim coat over the entire surface, so the board paper and the joint compound take paint the same way.

GA-214 recommends Level 5 under gloss, semi-gloss and other non-textured paints, and where light hits a wall at a low angle, for example from wall washers or a nearby window. Level 4 is the common choice under flat paint.

Light that meets a wall at a low angle, from tall windows, skylights or wall washers, throws a shadow off the smallest ridge. GA-214 calls this critical lighting and recommends a Level 5 finish where it occurs.

Yes. Walls and ceilings are both finished ready for paint.